A former military property which has now been converted to office premises.
Replacement of a system from one of Kabona’s competitors with a web-based system which is over-modulated by Ecopilot®. This aims to utilise the large thermal inertia in the previous barrack building.
Garnisonsfastigheter
Brigadgatan 12 och 22
3.286
2013
Concrete
Office
Heating: 40 kWh/m2
14 tonnes CO2/year
30%
Significantly reduced energy consumption of both cooling and heating. The indoor environment has improved for the tenants and simplification for the operating personnel has taken place through the tool Ecopilot® Analysis.
Brigadgatan now has a C-classification in accordance with the European standard for energy efficient buildings. This corresponds to 75–100 per cent of the new construction requirement for premises. Without an Ecopilot® installation, Brigadgatan would have an E-classification.