Harry Sjögren – Cedern
A former textile industry property which has now been converted into an office building. The property is located by the bridge Centralbron in central Borås.
Assignment/solution
The property owner was interested in the innovative Ecopilot® system. It resulted in us being assigned to install Ecopilot® which over-modulates the property’s existing control system and optimises the ventilation, heating and cooling system.
Customer
Harry Sjögren
Building
Cedern
Area
7.339
Installation year
2013
Building Framework
Brick/Concrete
Type of Building
Office
Savings
Heating: 25 kWh/m2
Carbon reduction
10 tonnes CO2/year
Yield
45%
45%
Yield on invested capital26%
Energy saving heating10
Reduction CO2 tonnes/yearResults
The property owner is highly satisfied with the saving outcome. But the best effect is the improved control of the indoor climate which Ecopilot® Analysis has provided. This installation, which was a test from the start, resulted in Ecopilot® being installed in several of the customer’s properties.
Energy classification
Cedern now has a C-classification in accordance with the European standard for energy efficient buildings. This corresponds to 75–100 per cent of the new construction requirement for premises. Without an Ecopilot® installation, Cedern would have a D-classification.